Interior shuts down large Mass. offshore wind farm after blade failure
The U.S. Interior Department has shut down the planned 804-MW Vineyard 1 wind project operating and under construction in federal waters some 15 miles off Nantucket Island. The order came after a blade on one of the 13-MW wind turbines shattered on July 17 spreading debris, some of which washed up on beaches on the… More Interior shuts down large Mass. offshore wind farm after blade failure